Skip to main content
FM-200 suppression

GASEOUS SUPPRESSION

FM-200 suppression

Clean-agent suppression · critical technical rooms

Fast, clean-agent protection for server and control rooms.

Agent
HFC-227ea
Residue
Clean agent
Design basis
Room volume + enclosure integrity
Suitable zone
Server · UPS · archive

FM200 SYSTEM

A clean agent response engineered for the room.

An FM200 solution is assessed as one system: a clean agent, detection logic, pipe network and control panel. Correct selection considers the protected room's volume, enclosure integrity and operational use together—not equipment in isolation.

Designed for occupied spaces, this system leaves no residue, is non-conductive and helps protect critical infrastructure.

Discharge
< 10 sec
Residue
0
Use
Server · Archive · UPS
FM-200 suppression

OPERATING PRINCIPLE

From confirmed signal to controlled discharge.

The system design follows the actual layout and operational conditions of the technical room.

  • 01

    Detection and confirmation

    Appropriate signal logic helps reduce false-release risk and makes the next action visible.

  • 02

    Volume calculation

    Agent quantity and nozzle layout are designed around room volume, openings and engineering penetrations.

  • 03

    Acceptance checks

    Control, warning, interlock and handover records are completed through clear facility-specific checks.

APPLICATION AREAS

For continuity around sensitive equipment.

The final decision follows a site survey and project parameters.

  • 01

    Server rooms

    Zones where downtime and data-loss risk call for a residue-free response.

  • 02

    UPS and electrical rooms

    Enclosed spaces that require a technical solution coordinated with electrical infrastructure.

  • 03

    Archives and control rooms

    Protection zones selected to minimise potential impact on records and equipment.

DELIVERY PATH

A traceable path from room survey to system handover.

The stages cover the engineering decision and acceptance criteria as well as installation.

  1. 01

    Collect site inputs

    Room volume, penetrations, ventilation and existing-system interfaces are recorded.

  2. 02

    Engineer the solution

    The agent, pipe route, nozzles and panel logic are included in the confirmed scope.

  3. 03

    Integrate and test

    Detection, warning and interlock points are checked with related systems.

  4. 04

    Handover and service plan

    Acceptance records and the follow-up inspection route are shared with the facility team.

FREQUENTLY ASKED QUESTIONS

Let’s determine the right scope for your facility.

Is FM200 the same solution for every room?

No. Volume, enclosure integrity, operating use and existing systems are core design inputs. An engineer determines the appropriate configuration after reviewing them.

Does the system leave residue?

A clean-agent system is intended not to leave powder or liquid residue after discharge. Post-event procedure is still defined by the actual equipment and manufacturer instructions.

What is checked after installation?

The checklist follows the project scope and may cover control logic, warning, interlocks, visible installation quality and handover records.

DEFINE YOUR SYSTEM

Request a technical review for your FM200 system.

Share the room use, approximate volume and existing systems so an engineer can define the next clear step.